|
Sage 300 Manufacturing
|
Shop Floor Control (S/C) |
|
|
|
Key Features:
- Detailed Time Entries for Shop Floor: Production can now effectively record actual operation times against MO products and operations. Time entries include setup time, direct runtime, cleanup, rework, downtimes and indirect stoppages.
- Operator & Shift Information: S/C Time records include shop operator and shift data. This allows process engineers to analyze performance o a per operator, per shift basis. |
- Work Center & Station Records: Work Centers in M/F are further divided into stations in Shop Floor. Time entries include both work center and station information for use in utilization analysis.
-Automatic MO WIP Consumption: S/C allows MO work in Progress (WIP) quantities to be consumed based on receipt and scrap quantities in shop floor. This provides online WIP balance information for M/F.
- Shop Floor User Maintenance: For ease of use, S/C provides fora shop floor user master where defaults can be maintained per user ID. Shop time entry method is also defined per user.
- Optional Resource Cost Allocation: Cost accountants can periodically allocate actual resource costs (e.g. Overhead) to products via MO records. Cost allocation can be based on proportional lobor hours or material issuance costs. |
<<Back |
|